Bench modeSteps, parts, and safety only. Big type for a phone at the bench.
Phase 0

The Map

Know the territory, set up the bench, agree on safety, learn to keep a notebook.

Everything here is short and most of it is reference. Read the six territories and the six spines once, do the safety charter properly, and set up the smallest bench that lets you start Phase 1 this week.

Most courses begin with theory and end, if ever, with a project. This one is upside down on purpose. In Phase 1 you will hear a neuron and see your own brain rhythm before you have been told what either one is. The theory comes after, and it lands differently when it explains something you have already watched happen on your own bench.

Phase 0 exists so that Phase 1 can start this week. It is a map of the field, a shopping list, a set of safety rules, and a way of writing things down. Skim the map, do the safety page slowly, and buy or borrow the smallest bench that gets you to the first project.

How to use the site

Every page has the same shape. A project page tells you what you will see or hear, how long it takes, what it costs, and then the steps. An explainer opens with something you have already seen and works backward to why. Deep dives are collapsed with their time cost written on them; open them or not. Terms with a dotted underline show a one-sentence definition when you hover or tap. Notes in the margin are optional. A line that says “you can stop here” means it.

The header has three switches. Skim, Read, Deep sets how much of an explainer you see. Bench strips a project page to steps, parts, and safety in big type, for a phone at the soldering iron. Field notes appears on pages where someone has recorded what actually happened when they built the thing.

Progress on this site is a list of things you have made: a plot, a measured number, a build log. There are no points and no streaks. A recall prompt in a lesson, once you answer it, enters a review queue that resurfaces it days later, which is the single most effective study technique there is and the one almost nobody uses.

Order

Read the territories and the spines first, then the Utah map, because it changes what the rest of the site means for someone in Salt Lake City. Then the bench tiers and the safety charter. The two “how to read” pages can wait until you have a datasheet or a paper in front of you.

Explainers

Theory that attaches to what you just built. Read after doing.

Skills

Hand skills and software skills picked up along the way.

Reference

Look-up pages.

Ready for Phase 1 when

Checks save on this device

What an interviewer would ask

If you can answer these, you are done here
  1. Why does biomedical engineering need a spine, and which one are you leaning toward and why?
  2. What is the difference between EEG, ECoG, and intracortical recording, in one sentence each?